Ambercor Shipping Canada and USA, members to the Worldwide Project Consortium (WWPC), handled the transport of one cold box with dimensions of 15,3 x 4,91 x 3,90 meter and a weight of 95 ton from ex factory Port Robinson, Ontario to a jobsite in Minnesota for a large LNG project.

The Cold Box was loaded at the factory and driven onto a deck barge at Port Robinson.

From there the barge travelled thru the Great Lakes to the Port of Duluth where the trailer was discharged and drove 402 kilometer to the final destination.