Express Global Logistics PVT. LTD (formerly known as Express Transport), a member of the Worldwide Project Consortium WWPC in India, arranged for the delivery of two heavy tyre mounted cranes and timely loading of 82 Mt x 1 & 70Mt x 1 of cranes onboard M.V. Grand Orion from Mumbai Port, India to Jebel Ali Port, UAE.
• Total volume moved was 510 CBM • The heaviest crane weighted 82 MT measuring 16.00 X 3.40 X 4.00 m • Total pkgs 7 & total weight 169.25 MT Scope of Work involved: • Providing specialized driver to drive the cranes from site to Mumbai port (Total distance 500 km approx. / total time to transport 3 days). • Providing specialized driver for shifting the crane inside the Mumbai Port & loading on the vessel. • Providing engineers to do the servicing of crane at port before loading. • Providing an escort team for movement from site to Mumbai Port. • Fabricating a special saddle for onboard lashing and securing. • Identifying and booking suitable vessel as per the arrival of cargo at port.