OLT Offshore LNG Toscana informs that the first phase of extraordinary maintenance intervention at the FSRU Toscana terminal has been successfully completed and on scheduled time.
The Terminal, which had been in Genoa since last April for this first part of the intervention, was towed, with the support of three tugs, to the port of Marseille, where the extraordinary maintenance operations aimed at replacing the bearing of the anchoring system, a system designed and built to ensure the rotation of the Terminal around the geostationary turret permanently anchored to the seabed, will be completed.