Heavy Transformers from Belgium to Oman by Polytra
| Jan 02 2018 at 06:22 AM
Polytra N.V., member to the Worldwide Project Consortium (WWPC) for Belgium, arranged the loading for two transformers, each weighing 210 tonnes onto a barge from Mechelen and direct transshipment ex barge on board ocean carrier “Rickmers Singapore” via the vessel’s crane in Antwerp port. Additionaly 2000 freight tons palletized oil drums, cases and crates with accessories were loaded onto the "Rickmers Singapore" for the same project. The cargo was shipped to Oman and got discharged in the Port of Sohar during December 2017.
This Article Is Archived For Top Tier Subscribers Only
View the full archived article by Logging in!
Log In