Van Oord selects KENC Engineering for design lifting tool Saint-Brieuc OWF
posted by AJOT | Nov 18 2020 at 09:12 AM
On the 12th of November leading marine contractor Van Oord, awarded Breman Machinery and KENC Engineering with the assignment to design and build a casing lifting adapter (CLA). The lifting tool supports the installation of 190 pin piles at Saint-Brieuc offshore wind farm.
The CLA can handle 275 tonnes and is designed to connect with the temporary casing used during drilling operations. It is equipped with redundant safety pin connections and can be operated remotely. The lifting tool includes a sub-sea IP camera to provide real-time images during fitting operations. In early February 2021 the CLA will be delivered to Van Oord. Eric Buining, manager director at KENC: “This is a great award for KENC Engineering, we are delighted to have been selected by Van Oord to contribute with our expertise and look forward to a smooth and successful project!”.
More Project / Heavy Lift
XLP member, Aprojects GmbH successfully delivers valve skid to Sweden
STV to spearhead design for VPRA’s Long Bridge South Package, linking Virginia and Washington, D.C.
STV, a leading professional services firm that plans, designs and manages infrastructure projects across North America, today announced the Virginia Passenger Rail Authority (VPRA) has selected the firm to lead…
Kalmar and Westport AKalmar has delivered four Kalmar electric reachstackers to Norwegian porS partnership strengthens with with delivery of four electric reachstackers supporting zero-emissions goals